Featured Case Study

In-service composite repair of high-pressure energy infrastructure

Client
Con Edison
Facility
Transmission Distribution System
Location
New York, NY

Challenge

Aging high-pressure fluid-filled dielectric electric feeders experiencing corrosion and leak risk. Traditional refurbishment requires welding a custom-fabricated new pipe over the existing feeder—a significant capital expenditure.

Solution

IIS engineered and deployed a composite refurbishment system designed as a secondary pressure boundary, compliant with ASME PCC-2 and utility engineering standards.

Execution

Engineering analysis, design and testing validation, QA/QC and nondestructive examination, in-service installation with zero downtime.

Results

Decades
Asset life extended
Zero
Downtime required
$10M+
Capital deferred
100%
Leak avoided
Selected Engagements
Con Edison
Transmission Distribution System
New York, NY
Ravenswood Generating Station
Power Generation
Queens, NY
Athens Generating Station
Combined-Cycle Plant
Athens, NY